In order to establish a timetable, it is necessary to determine how much time really should be authorized for loading and unloading the cargo. For example, with the remuneration scheme: do not forget that the shipper has offered two times for that cargo to be loaded to the ship, but https://reidiudlu.bcbloggers.com/34127566/the-5-second-trick-for-101-discrepancy-fee-negotiation-in-letter-of-credit